Install cost assumed € 1,450 /kWp turnkey (typical 2024-2025 EU residential range — varies by region and installer). 60% self-consumption, residual exported at 7 ¢/kWh average. For your specific city, see the per-city table below. TL;DR: A 5 kWp photovoltaic system costs €8,000–12,000 in Austria in 2026 (before subsidies). 67 ct/kWh for 13 years), federal subsidy (€250/kWp, max €5,000) and state subsidy (Styria: up to €2,000), the net cost falls to €4,000–6,000. Complete guide to importing solar panels from China to Austria: duty rates, VAT, required certifications, main ports, top brands, and Q1 2026 landed-cost benchmarks. Submit a spec inquiry for order-specific CIF/DDP pricing — Frank will email a formal PI within 24h. Austria targets 100% renewable electricity by 2030. Federal Klimaaktiv rebate stacks with state-level subsidies. Payback periods usually fall between 6 and 12 years, driven by self‑consumption rate.