Dungeness B is an advanced gas-cooled reactor (AGR) power station consisting of two 1,496 MWt reactors, which began operation in 1983 and 1985 respectively. Dungeness B was the first commercial scale AGR power station to be constructed. Its design was based on the much smaller Windscale AGR prototype. The £89 million contract was awarded in August 1965 to Atomic Po. OverviewThe Dungeness nuclear power stations are a pair of non-operational located on the in the south of, England. Dungeness A is a legacy power station con. Dungeness A is a legacy power station that was connected to the in 1965 and has reached the end of its life. It possessed two nuclear producing 219 MW of electricity each, with a total capa. On 15 April 2009, Dungeness was included in a list of 11 potential sites for new nuclear power stations, at the request of, which owns and operates Dungeness B. The government did not include Du. From 1961 to 1984, Dungeness power station also housed the of the converting into for transmission on, the power cabl.
[PDF Version]